Pre-Engineered Buildings

Pre-engineered buildings are buildings that have been designed, engineered and manufactured offsite. The components are delivered to the construction site and erected to get the required building.

PEBs are manufactured from pre-fabricated steel sections. The steel sections are then bolted/screwed together at the site, and a knocked-down version of it is transported to the site, where a team of experts undertakes erection. Steel is used for the primary and secondary members, with other materials added to the roof structure wherever required. The structures can be erected more quickly and efficiently than conventional buildings and require less on-site labour; however, some degree of on-site welding is required for cladding.

Applications

Storehouses

Aviation & Hangars

Warehouses

Other Large Span Buildings

Factory Sheds

Components of a Pre-Engineered Building

Main Frame Steel Column and Rafters

Built-up plate section is a highly accurate and quick structured welding process that allows pre-engineered buildings to derive maximum benefit of steel consumption by using high strength through built-up plate sections for optimal steel consumption.

Girts

Grits are the secondary horizontal member, usually attached to the main frame columns.

Wall girts are used to support built-in partitions or to create columns or arches. The wall girts could be flat or curved and of various thicknesses and variable depths dependent upon the design. They are connected to the external extensions of the columns along the walls. The clips provide a method for joining wall girts to the outer projection of the side wall lines or external girders, thus forming separate wall segments.

Thus, wall girts are a vital component of the pre-engineered structure and form a part of the connectible sheeting and primary framing system.

Bracing

The innovative design of the bracings creates a simple, easy and efficient way to support the building. The building design is more stable and flexible than other buildings, with hidden brace rods or cables placed diagonally in the roofs and walls to transfer wind loads to the foundations and longitudinally stabilise the building.

In today’s times, steel building construction steel has replaced the heavy conventional structural materials and concrete structures. Wind bracing, a significant element of a primary framing system, along with the other conjunction components, makes it possible for the steel to be lightweight enough to become a part of modern steel building constructions.

Wall Cladding

Cladding for the exterior walls is done using either insulated panels or PPGI/PPGL sheets, along with their attachments, trim, and weather sealants. Panels made of 26 gauge thick profiled Galvalume or Galvalume color coated steel sheeting shall conform to the physical specifications and have a minimum yield strength of 345 MP. Galvalume panels are pre-painted with 1 mil on the exterior face. Thick factory applied polyester paint. Factory-applied polyester paint is applied to the interior face of the panel. Each panel is intended to cover one meter and is capable of being shipped in any length up to 12 meters.

Roof Cladding

We provide our customers with roofing sheets with optional one-metre coverage, which can be shipped in any length within the 15-metre range.

Downspout Pipe

Downspout is a tube that connects the gutter on a building or structure to a storm drain or soakaway.

It is rectangular, and painted with a rust-proof paint with an elbow at the bottom and supported by an attachment to the wall covering at 3 m maximum spacing.

Eave Gutter

An eave is where water gets collected at the edge of a roof. The colour of our eave gutters is 0.5MM nominal thickness sheet.

Gable Trim

Gable trims aesthetically hide the necessary seams in your roof and usually have an added benefit in strengthening your roof. It closes the opening between the roof and wall panels.

Canopy

A canopy is a structure that provides shade, protection from weather conditions such as sun and hail, or shelter. One can also attach fabric or metallic covering to it. 

It is an overhanging or projecting roof surface below the eave level, supported at one end only. Modern canopies are a simple and affordable way to anchor your building and are available in many different styles, colours and materials to complement any building. Canopies are supported by the building to which they are attached and often by a ground mounting provided by not less than two stanchions or upright support posts.

Framed Opening

Our framing products are designed to accommodate a vast range of accessories, such as sliding doors, rollup doors, screen doors and security windows.

Mezzanine Joint

A mezzanine bar joist is a highly versatile product. It can support the decking on roofs/floors, hung from the roof trusses, or set into columns.

Mezzanine Beam

A horizontal beam is designed to resist moments and shears and is used in flooring and roofing systems.

Request a quote

    Auditorium for the Rezangla War Memorial

    Constructed the Auditorium for the Rezangala War memorial using LGSF Technology at an height of more than 15500 foot above sea level. This was executed by BNAL within a record time of 1 month and was greatly appreciated by all concerned. The memorial has been made to commemorate the supreme sacrifice made by 114 Brave Hearts of the Indian Army and was dedicated to the nation by the Hon’ble Defence Minister of India Shri Rajnath Singh on 18th November 2021.

    Aircraft Hangar  

    Recently completed Aircraft Hangar with motorised gates and double storey annexes on both sides.
    The hangar was completed from start to finish within 5 months making it possibly the fastest
    construction for an Aircraft Hangar in India.

    LGSF House at Kasauli

    Double Storey Three Bedroom Prefabricated Cottage
    using the latest state of the art LGSF technology.

    Sports Stadium in 7 schools in Chandigarh

    Executed PEB works for 7 nos. of Indoor Sports stadiums at various Government Schools in Chandigarh.
    The Buildings have a clear span of 62 Meters and total area executed is 2,70,000 sq. ft.

    NTPC Project at Hazaribagh

    BNAL has executed complete turnkey project for NTPC at Hazaribagh. The scope of work included design, Manufacture, Supply and Erection of Single and Multi-Storey Prefabricated Structures including all Civil, Electrical, Sanitary and Plumbing Works. Total Area Executed – 65000 sq. ft. appx.

    Values

    Quality:
    We are committed to delivering products and services of the highest quality that meet or exceed customer expectations.

    Innovation:
    We are constantly seeking new and innovative ways to improve our products, processes, and services to better serve our customers and stay ahead of the competition.

    Ethics:
    We operate with integrity, honesty, and transparency in all our dealings with customers, suppliers, employees, and other stakeholders.

    Cost-effectiveness:
    We are committed to providing cost-effective solutions without compromising on quality or timelines.

    Customer Focus:
    We are dedicated to understanding and meeting the needs of our customers and building long-term relationships based on trust, reliability, and value.

    Customer Focus:
    We are dedicated to understanding and meeting the needs of our customers and building long-term relationships based on trust, reliability, and value.

    Sustainability:
    We are committed to reducing our environmental impact and promoting sustainable practices throughout our operations and supply chain.

    Safety:
    We prioritize the safety and well-being of our employees, customers, and communities in all aspects of our business.

    Industry Leading Technology:
    We are committed to employing technology in construction that ensures zero impact on the ozone layer and does not contribute to its depletion

    Commitment:
    We focus on solution delivery with complete adherence to service quality standards and zero deviation from committed timelines